The last 2 weeks have been fast paced!

Things have really progressed the past several weeks.  Wood flooring is complete, cabinets installed, trap windows put in, granite template and installation, finish carpentry almost complete, paint and stain secheduled, power for water installed.

upstairs bath cabinet

downstairs bath

flooring install

flooring installation

Bedroom flooring

Flooring almost complete

Wood floor

Granite arrives

Matt taking granite template

Granite bar installation

Kitchen counter install

Bath vanity

upstairs bath vanity

Downstairs bath vanity

kitchen granite counter top

pine doors installed

fireplace prepared for stone

loft railings being installed

loft railings

stone work begins on pillars